/ Rental Wind Turbines

Mid-scale turbines. Monthly rental. No permanent commitment.

10 kW to 100 kW units built for Gulf coastal and open-desert wind profiles. Equipment arrives ready to produce; your team measures the output and decides what comes next.

Turbine Classes

Three output tiers for different site loads

Site Requirements

What the site needs before we deploy

Minimum 0.5 hectares of clear ground per turbine, unobstructed 360-degree wind exposure, and a stable surface capable of supporting temporary foundation anchors. No permanent groundworks are required.

Class I: 10–25 kW. Suitable for remote facilities, telecom towers, and supplementary loads. Class II: 30–60 kW. Industrial yards and logistics compounds with consistent wind exposure.

Our deployment team handles all temporary civil works. At term end, anchors are removed and the site is returned to its original condition. Minimum rental term is three months.

Class III: 75–100 kW. Open-desert and coastal plant exteriors where sustained wind speeds exceed 6 m/s. All classes include a monitoring display and grid-tie inverter.

Wind resource assessment data from your site can be shared in advance. We confirm deployment feasibility within two business days of receiving site coordinates.

Wide environmental shot of a mid-scale wind turbine base in an industrial plant exterior, natural daylight, close-up of the anchor foundation and cable conduit connections running along the ground, steel-grey equipment surface against a pale sky, no people
Wide environmental shot of a mid-scale wind turbine base in an industrial plant exterior, natural daylight, close-up of the anchor foundation and cable conduit connections running along the ground, steel-grey equipment surface against a pale sky, no people
— From enquiry to output

Site confirmed. Equipment dispatched. Output recorded.

Step 1: Submit your site coordinates and target load. We confirm feasibility and issue a rental proposal within two business days.

Step 2: Our team arrives with turbine units, temporary anchors, and all cabling. Installation is complete within five working days of mobilisation.

Step 3: Monitoring is live from day one. You track output directly. At term end, we demobilise fully — or you extend the rental month by month.

Your deadline is shorter than a permanent planning application.

Tell us your site location, target output, and start date. We respond within one business day with turbine availability and a rental proposal.